Showing posts with label Norfolk Island Museum. Show all posts
Showing posts with label Norfolk Island Museum. Show all posts

Sunday, March 6, 2016

Ribs, roves and rivets



Note: This post continues from earlier Building a Lighter for Norfolk Island's cargo



Work continues with John Christian Bailey and Dean Burrell of JCB Cabinets hammering in the ribs. There are 43 ribs, spaced 200 mm apart.  The ribs are fastened firmly to the hull using copper rivets and roves. A rove punch is made of heavy steel and is an essential tool for neat copper nail and rove work. Traditional copper cut nails used with matching copper roves to form a copper rivet. These nails are extremely robust, easy to drive and when the wood fibres become damp and swell, will never work loose.
   

 



 



 
Regular posts on the building of the lighter will be uploaded to this blog.

Thursday, February 11, 2016

Building a Lighter for Norfolk Island's cargo

Note: This post continues from earlier Completion of the Lighter's hull
 

Work on the Lighter has now moved to the inside structure and Dean Burrell continues his painstaking handiwork.












Regular posts on the building of the lighter will be uploaded to this blog.

Monday, January 11, 2016

Attaching the clamps to the clinker

Note: This post continues from earlier Planking and clamping


The building of the lighter, the latest addition to Norfolk Island’s fleet continues. Lighters are used to transfer our sea cargo from ship to shore. As 99% of Norfolk Island’s cargo is imported by sea, the serviceability of the lighters is very important. With the loss of lighter No 11 in December 2014, this replacement is paramount.
 
Attaching the steaming hot plank (clinker) and holding it in place
Joining and nailing the clinker in place
Attaching the clamps

Final check to ensure a meticulous fit 
 Regular posts on the building of the lighter will be uploaded to this blog.

Sunday, January 3, 2016

Planking and Clamping

Note: This post continues from earlier Planing and Shaping Timber



Each plank is removed from the steamer (see Steaming and Malleability - 12 Nov)  and, whilst steaming hot, is shaped to the side of the lighter and held securely in place until clamps can be attached.


Dean Burrell holds steaming plank in place

 John Christian-Bailey secures the clamps

Each plank is held until the shape is confirmed to the lighter

Regular posts on the building of the lighter will be uploaded to this blog.