Showing posts with label steaming timber. Show all posts
Showing posts with label steaming timber. Show all posts

Monday, January 11, 2016

Attaching the clamps to the clinker

Note: This post continues from earlier Planking and clamping


The building of the lighter, the latest addition to Norfolk Island’s fleet continues. Lighters are used to transfer our sea cargo from ship to shore. As 99% of Norfolk Island’s cargo is imported by sea, the serviceability of the lighters is very important. With the loss of lighter No 11 in December 2014, this replacement is paramount.
 
Attaching the steaming hot plank (clinker) and holding it in place
Joining and nailing the clinker in place
Attaching the clamps

Final check to ensure a meticulous fit 
 Regular posts on the building of the lighter will be uploaded to this blog.

Sunday, January 3, 2016

Planking and Clamping

Note: This post continues from earlier Planing and Shaping Timber



Each plank is removed from the steamer (see Steaming and Malleability - 12 Nov)  and, whilst steaming hot, is shaped to the side of the lighter and held securely in place until clamps can be attached.


Dean Burrell holds steaming plank in place

 John Christian-Bailey secures the clamps

Each plank is held until the shape is confirmed to the lighter

Regular posts on the building of the lighter will be uploaded to this blog.

Thursday, November 12, 2015

Steaming and Malleability

The planks for the clinkers and carvels are fitted, removed and shaped with chisels, then softened to enable them to be moulded to the curvature of the lighter from bow to stern. This is done by enclosing each plank into a steamer - a metal box with an attachment through which an engine pumps steam onto the plank. The wood softens as the steam heats the fibres. After several hours the plank is removed and again fitted to the hull, moulded and clamped to the frame. Once cooled and the shape is assured it is again removed and undercoat is applied to each plank before it is finally attached to the frame, glued, hammered and clamped into place.
  
 

 The steamer is located in the yard outside.
 
 One or two planks are placed inside.

 The engine is checked and turned on... 


 
 to send boiling water to the steamer through an attachment on the top.
  
 Steam slowly rises from the steamer ...

 ...and builds in volume as the hours pass.
 
The softened plank is then carried inside ...
 

 ... and again fitted to the lighter.  Note the steam rising from the wood.

 
 After fitting and cooling the plank is again removed ...
 ... and undercoat is applied to each piece prior to final placement.

Regular posts on the building of the lighter will be uploaded to this blog.